Pool Plastering California
A resurfaced pool should look new for years, not months. Cen-Cal Pools and Spas handles pool replastering across Fresno, Clovis, and the Central Valley with full chip-out, proper shell prep, a single continuous pour, and a managed 30-day startup that protects the finish you paid for.

Interior finishes wear from the inside out. By the time a surface feels rough, the plaster has usually lost its cream coat and is starting to expose aggregate. Waiting past that point means more prep work later, not less.
Water is drained per local discharge rules and failing plaster is chipped from bond beam to floor, including behind fittings.
Hollow spots are cut out, the shell is acid-etched or bond-coated, and drains and fittings are replaced or reseated.
Plaster, quartz, or pebble is troweled in one continuous pour so there are no cold joints or color banding.
Pebble and quartz are acid-exposed and washed, then the pool is filled immediately and brushed on the startup schedule.
New surfaces cure for a month. We set the chemistry and brushing plan that determines how the finish looks a decade from now.
| Finish | Typical lifespan | Cost range | Notes |
|---|---|---|---|
| White plaster | 7–12 years | $5K–$9K | The classic bright-blue water look and the most affordable resurfacing option. |
| Quartz finish | 12–18 years | $9K–$14K | Crushed quartz aggregate resists staining and etching far better than standard plaster. |
| Mini-pebble | 15–20 years | $11K–$16K | Smoother underfoot than full pebble with most of the durability and depth of color. |
| Pebble (PebbleTec style) | 20–25 years | $12K–$18K | The longest-lasting interior finish and the most forgiving of imperfect water chemistry. |
Standard white plaster typically runs $5,000 to $9,000 for an average residential pool. Quartz finishes run $9,000 to $14,000 and pebble finishes $12,000 to $18,000. Square footage, surface prep, and whether tile, fittings, or coping are replaced at the same time drive the final number.
White plaster in the Central Valley usually lasts 7 to 12 years, quartz 12 to 18 years, and pebble 20 years or more. Hard water, heavy sun exposure, and inconsistent chemistry shorten those ranges, while steady water balance extends them.
Most resurfacing projects take 1 to 2 weeks from drain to refill. Chip-out and prep take a few days, the finish goes on in one day, and then the pool is filled immediately and brushed daily through the initial cure.
Resurfacing is the general term for replacing a pool's interior finish. Plastering refers to the specific material used, whether standard white plaster, quartz, or pebble. Every replastering job we do is a resurfacing job; the choice is which finish goes back on.
Yes, if the tile is sound we leave it in place and cut the plaster cleanly to the tile line. Because the water is already down, though, most homeowners replace waterline tile at the same time since the labor overlaps.
We measure your pool, recommend the right finish for your water, and quote it in writing.
Get My Resurfacing Quote